Allow scheduling meetings up to 6 months from scheduling date
under review
J
Jonathan Sibley
The limit is 16 weeks. Sometimes, clients would like to schedule meetings up to 6 months out, even if they might be rescheduled at some point before the meeting. And, these meetings are not always on a predictable, recurring basis.